Sieve | Sieve | 2 | Separation of large fractions of sawdust before drying (Hydrotreating) |
Screw conveyor for feeding sawdust | 2 | ||
Dosage Valve | 2 | ||
Conveyor for removing large fractions into the container | 2 | ||
Drying | Steel pipe 1 m in diameter, including calipers | 1 | Drying of sawdust by means of temperature and steam |
Circulation Fan | 1 | ||
Transport Fan with drying | 1 | ||
Valve | 1 | ||
Firebox | Movable grates, moving floor, hydroelectric station | 1 | Air Heating |
firebox Pusher | 1 | ||
3 MGW Firebox | 1 | ||
Ash Pusher | 1 | ||
MIH chamber (concrete and brick) | 1 | ||
Set of chimneys | 1 |
Pellet press | 1 | Pellet Press |
Cyclone | 1 | Pressing sawdust into briquettes and sawing to size | |
Mixer with screws | 1 | ||
Briquette press | 2 | ||
Cooling Line with tires | 2 | ||
Gas exhaust Collector, fan and cyclone | 2 | ||
Cutting moving saw with aspiration system and filter | 2 | ||
Carriage for briquettes with tires | 10 |
Pyrolysis chamber with a heating chamber (battery) | 2 | Obtaining charcoal briquettes by pyrolysis | |
Loading/unloading Station with a pusher and a screw | 2 | ||
MIH Chamber with a "bridge" valve | 1 | ||
Chimney with an arson function | 2 |
Stabilization chamber with additional heating chamber | 1 | Stabilization of charcoal briquettes | |
loading/unloading Station with pusher and screw | 1 | ||
Control System with valves and hatches | 1 |
General control system from the process control center (one PC and 2 screens) | 1 | Control system for drying, pressing, pyrolysis and stabilization and process control | |
Control Panel with emergency button | 1 | ||
Main power cabinets | 1 | ||
Container for power cabinets | 1 |
Trolley for briquettes in the disassembled state (in the form of modules) | 100 | Moving briquettes from briquetting to pyrolysis and stabilization | |
Caps for briquettes in the disassembled state (in the form of modules) | 20 |
Trolley for briquettes in the disassembled state (in the form of modules) | 100 | Moving briquettes from briquetting |